中文 ☎ +86 189 6972 3308
LV SWITCHGEAR

LV Switchgear
GCS / GCK / MNS / GGD / JP

Draw-out and fixed types, modular structure, easy maintenance — with CCC self-declaration.

Short answer: Pengbian Electric builds GCS, GCK and MNS draw-out switchgear, GGD fixed type and JP outdoor distribution panels — all four CCC self-declaration units covered, typically 15–30 days.
Yueqing oil-immersed transformer S13 on the production line
Yueqing compact substation, European type
Yueqing HV/LV switchgear KYN28A assembly
01 / SPECIFICATIONS

Specifications

Standard range shown below; the technical agreement and factory test report take precedence.

ItemRange / Notes
ModelsGCS, GCK, MNS, GGD, JP outdoor distribution panel, GGJ capacitor bank
Rated voltage400V / 690V AC
Rated currentUp to 6300A busbar
Rated short-time withstandUp to 100kA (1s)
StructureDraw-out (GCS / GCK / MNS) / fixed (GGD)
Form of separationForm 1 – 4 to project requirement
ProtectionIP30 / IP40 indoor, IP54 outdoor version
CertificationCCC self-declaration: GCS / GGD / GGJ / JP units
StandardsGB/T 7251.1, GB/T 7251.2; IEC 61439-1/-2 for export
FinishPowder coating, colour to customer card
02 / TYPES

Model comparison

ModelStructureApplication
GCSDraw-outLarge distribution centres, industrial plants; drawer interchangeability
GCKDraw-outGeneral LV distribution, economy version
MNSDraw-outHigh-reliability and foreign-invested projects, high module density
GGDFixedCost-sensitive, few circuits, fixed wiring
JP panelOutdoor integratedRural networks, distribution transformer areas: metering + compensation + outgoing
GGJFixedReactive power compensation, switched in banks
Four numbers decide an LV board: busbar rated current, short-circuit withstand, number of outgoing circuits and form (draw-out or fixed), plus whether metering and compensation are included. Send the single-line diagram and we quote item by item.
03 / LEAD TIME

Lead time

TypeLead timeConditions
Standard configuration15–30 daysDrawing confirmed, production scheduled
With imported ACBs25–40 daysLead time of ABB / Schneider / Siemens breakers
With smart meters and SCADA20–35 daysProtocol and point list confirmed
04 / FAQ

Frequently asked questions

GCS versus GCK?
Both are draw-out. GCS uses uniform drawer sizes with better interchangeability and higher busbar capacity; GCK is more economical for boards with fewer circuits and tighter budgets.
Why is MNS more expensive?
Higher modularity, more circuits per cubicle and stricter reliability design — common in foreign-invested and high-end manufacturing projects.
What does CCC self-declaration mean?
LV assemblies are managed by CCC self-declaration: the manufacturer declares conformity and files it on the national certification platform. It can be checked at cx.cnca.cn and the number is on the nameplate.
Can it be installed outdoors?
GGD is available in an outdoor version with rain hood and IP54; the JP panel is an outdoor integrated unit by design.
What is the lead time?
15–30 days standard; 25–40 days with imported ACBs or smart meters.

Send the parameters, price within 24 hours

Tel / WeChat +86 189 6972 3308 Email cnpengbian@126.com

Request a quote →
☎Call WhatsAppExport desk Quote24h reply