Draw-out and fixed types, modular structure, easy maintenance — with CCC self-declaration.
Standard range shown below; the technical agreement and factory test report take precedence.
| Item | Range / Notes |
|---|---|
| Models | GCS, GCK, MNS, GGD, JP outdoor distribution panel, GGJ capacitor bank |
| Rated voltage | 400V / 690V AC |
| Rated current | Up to 6300A busbar |
| Rated short-time withstand | Up to 100kA (1s) |
| Structure | Draw-out (GCS / GCK / MNS) / fixed (GGD) |
| Form of separation | Form 1 – 4 to project requirement |
| Protection | IP30 / IP40 indoor, IP54 outdoor version |
| Certification | CCC self-declaration: GCS / GGD / GGJ / JP units |
| Standards | GB/T 7251.1, GB/T 7251.2; IEC 61439-1/-2 for export |
| Finish | Powder coating, colour to customer card |
| Model | Structure | Application |
|---|---|---|
| GCS | Draw-out | Large distribution centres, industrial plants; drawer interchangeability |
| GCK | Draw-out | General LV distribution, economy version |
| MNS | Draw-out | High-reliability and foreign-invested projects, high module density |
| GGD | Fixed | Cost-sensitive, few circuits, fixed wiring |
| JP panel | Outdoor integrated | Rural networks, distribution transformer areas: metering + compensation + outgoing |
| GGJ | Fixed | Reactive power compensation, switched in banks |
| Type | Lead time | Conditions |
|---|---|---|
| Standard configuration | 15–30 days | Drawing confirmed, production scheduled |
| With imported ACBs | 25–40 days | Lead time of ABB / Schneider / Siemens breakers |
| With smart meters and SCADA | 20–35 days | Protocol and point list confirmed |
Tel / WeChat +86 189 6972 3308 Email cnpengbian@126.com
Request a quote →