Four scenarios — PV, industrial parks, overseas EPC and OEM supply — with the configuration we ship and the checks that matter on site. Client names are covered by NDAs; technical packages are available on request.

Client names, project titles and contract values are covered by confidentiality agreements. What follows is scenario-level scope and site practice. Single-line diagrams, configuration lists and test documentation for comparable projects are available under NDA.

PV and BESS projects: substation scope

For ground-mount, hill-site, floating and rooftop PV, the difference in a compact substation is not the rating — it is the IP class, cable entry direction, cooling method and metering position. We issue the single-line diagram against your layout and inverter scheme first, then fix enclosure size, door swing and foundation level.

ScenarioTypical configurationParameters to fix early
Utility-scale ground mountAmerican / European type substation + RMU35 kV step-up, IP54, oil or dry type, anti-condensation
Commercial rooftopCompact European type10 kV / 0.4 kV, dry type, IP33–IP54, roof load
BESSBESS cabin + step-up transformer35 kV step-up, ventilation, fire interlock

Related: compact substations · BESS cabinets & PV panels · dry-type transformers

Industrial parks and commercial buildings

The usual package is one or two 10 kV / 0.4 kV transformers, LV switchgear and an HV ring-main unit. At this level the cost driver is rarely the transformer: it is load calculation, reactive compensation sizing and cubicle arrangement. One size up on the transformer pulls cable, switchgear and civil works up with it.

Common practice is to size at 60–80 % loading and leave room for three years of expansion. Basements, intermediate floors and occupied buildings take dry type; a dedicated substation room above roughly 800 kVA usually takes oil-immersed. The numbers depend on your load curve, not on installed capacity alone.

Related: dry-type · oil-immersed · LV switchgear · HV switchgear

Export and overseas EPC delivery

Export problems are usually not in manufacturing but in documents and system data: voltage and frequency, nameplate language, packing, certification files, spare parts list. The same model shipped to Africa and to Europe may differ in three places on the drawing.

System

50 / 60 Hz and local voltage

A 60 Hz build needs flux density, turns and temperature rise recalculated — not a 50 Hz drawing with a new nameplate.

Standard

IEC / ANSI and test scope

Routine tests to IEC 60076 or the customer standard; type tests confirmed per project.

Documents

English nameplate and manuals

English datasheet, routine test report, packing list, O&M manual; neutral packing available.

Logistics

Seaworthy wooden cases

Moisture protection, impact protection, lifting marks; knocked-down or fully assembled quoted separately.

We ship to Europe, the Americas, South-East Asia, the Middle East and Africa. If your market requires local certification or third-party type tests, tell us the destination before quoting. Related: 60 Hz export builds · E-houses and substations

Long-term supply to panel builders and OEMs

This group does not need a unit price, it needs a stable batch rhythm and a fixed interface: enclosure dimensions, busbar routing, secondary terminals, paint colour — all aligned to your process. One rework costs more than the saving on a single unit.

In practice we lock production slots under an annual framework, give framework customers priority in peak season, and release batches only after first-article approval. Related: oil-immersed · dry-type · cable boxes

Need a configuration list for a comparable project? Call +86 189 6972 3308 or email cnpengbian@126.com with project type, rating and voltage. Reply within 24 hours.

Which scenario is your project?

Send the single-line diagram, rating and voltage. We reply with a configuration and a price.

Send project details →
☎Call WhatsAppExport desk Quote24h reply