NEW ENERGY & STORAGE

BESS Cabinet / PV Grid Panel
PV + Storage + EV Charging

Complete equipment for PV, storage and charging projects — factory built, fast on site, configured to project capacity and grid requirements.

Short answer: Pengbian Electric builds BESS cabinets, PV grid-connection panels and PV+storage+charging packages — factory assembled and shipped complete, configured to capacity and grid mode, typically 25–40 days.
Yueqing oil-immersed transformer S13 on the production line
Yueqing compact substation, European type
Yueqing HV/LV switchgear KYN28A assembly
01 / SPECIFICATIONS

Specifications

Standard range shown below; the technical agreement and factory test report take precedence.

ItemRange / Notes
RangeBESS cabinet, PV grid-connection panel, PV+storage+EV package, PV substation, EV-charging substation
Storage capacity100kWh – 5MWh per project, cabinets paralleled
BatteryLFP (lithium iron phosphate) as standard
PCS rating50kW – 500kW per cabinet
Grid voltage0.4kV / 10kV / 35kV with step-up transformer
Operating modeGrid-tied / off-grid / seamless transfer
Thermal & fireAir or liquid cooling; smoke, temperature and gas detection with clean-agent suppression
CommunicationRS485 / CAN / Ethernet, Modbus TCP, IEC 61850 optional
StandardsGB/T 36276, GB/T 34120; grid connection per GB/T 36547
DeliveryComplete cabinet shipped; lift, connect and commission on site
02 / SCOPE

Three product families

BESS cabinet

Battery racks, PCS, thermal management and fire fighting integrated; grid-tied or off-grid.

PV grid-connection panel

Combining, metering and protection in one, matched to a substation or step-up transformer.

PV + storage + EV package

PV substation, BESS cabinet and EV-charging substation combined to capacity and grid requirements.

PV substation

Step-up transformer with HV and LV rooms, matched to inverters and the grid panel.

EV-charging substation

Matched to charging stacks with space for metering, communication and future expansion.

System integration

Single-line diagram, protection scheme and communication network issued together.

A storage project is decided by four things: capacity and duration (kWh / kW), grid voltage, grid-tied or off-grid, and fire requirements. Once those are fixed, the cabinet configuration and the price are essentially fixed too.
03 / LEAD TIME

Lead time

TypeLead timeConditions
Standard configuration25–40 daysScheme confirmed, cabinet production
With long-lead cells40–60 daysCell lead time and project scheduling
With transformer and grid panel35–50 daysPrimary equipment package cycle
04 / FAQ

Frequently asked questions

How is a BESS cabinet different from a distribution panel?
A BESS cabinet contains battery racks, PCS, BMS, thermal management and fire fighting — thermal and safety design are the core. A distribution panel only switches and protects.
Can it be combined with PV?
Yes. PV grid panel, PV substation, BESS cabinet and EV-charging substation can be supplied as one package with a single definition of the primary system and communications.
What is needed for grid connection?
A connection scheme and commissioning acceptance, which vary by local grid company. We provide equipment data, test reports and the grid-panel configuration to support your application.
How is fire protection handled?
Smoke, temperature and combustible-gas detection with clean-agent suppression, plus internal fire partitions and pressure relief, selected per project.
What is the lead time?
25–40 days standard; 40–60 days where cells and other long-lead items are involved.

Send the parameters, price within 24 hours