Complete equipment for PV, storage and charging projects — factory built, fast on site, configured to project capacity and grid requirements.
Standard range shown below; the technical agreement and factory test report take precedence.
| Item | Range / Notes |
|---|---|
| Range | BESS cabinet, PV grid-connection panel, PV+storage+EV package, PV substation, EV-charging substation |
| Storage capacity | 100kWh – 5MWh per project, cabinets paralleled |
| Battery | LFP (lithium iron phosphate) as standard |
| PCS rating | 50kW – 500kW per cabinet |
| Grid voltage | 0.4kV / 10kV / 35kV with step-up transformer |
| Operating mode | Grid-tied / off-grid / seamless transfer |
| Thermal & fire | Air or liquid cooling; smoke, temperature and gas detection with clean-agent suppression |
| Communication | RS485 / CAN / Ethernet, Modbus TCP, IEC 61850 optional |
| Standards | GB/T 36276, GB/T 34120; grid connection per GB/T 36547 |
| Delivery | Complete cabinet shipped; lift, connect and commission on site |
Battery racks, PCS, thermal management and fire fighting integrated; grid-tied or off-grid.
Combining, metering and protection in one, matched to a substation or step-up transformer.
PV substation, BESS cabinet and EV-charging substation combined to capacity and grid requirements.
Step-up transformer with HV and LV rooms, matched to inverters and the grid panel.
Matched to charging stacks with space for metering, communication and future expansion.
Single-line diagram, protection scheme and communication network issued together.
| Type | Lead time | Conditions |
|---|---|---|
| Standard configuration | 25–40 days | Scheme confirmed, cabinet production |
| With long-lead cells | 40–60 days | Cell lead time and project scheduling |
| With transformer and grid panel | 35–50 days | Primary equipment package cycle |